Custom developmentBuilt for you

Our custom software development process: from requirements to production

We build new products from your requirements — with one team from the first conversation to the system in production, and the same team supporting it afterwards.

  • GDPR by design
  • 24/7 operation and support
  • A team of 5 in Sofia, EU

Already running in production at organisations in Bulgaria — names under NDA.

How we prove it →

How a project is built

From a written requirement to a running system, in steps you can see

A custom project should never disappear for months. Requirements are written down first, the design follows, and the system grows in short steps you can check, until it runs in production and we look after it.

  1. RequirementsWe write down together what the system must do.
  2. DesignScreens, data and security, agreed before the build.
  3. BuildShort steps you can see and test as they land.
  4. LaunchInto production, secured and monitored.
  5. RunWe operate it, support it and keep improving it.

Five stages

1. Requirements

We write down your requirements together: who uses the system, what they must be able to do, which data and systems are involved, and how you will know it works. This short phase ends with a written scope and an estimate.

2. Design

We design the structure, the screens and the data, with security designed in from the start: access by role, audit logs, encryption and GDPR.

3. Build in visible steps

We build in short steps, each ending with something working that you can see and try. You steer the product while it is being built, not only at the end.

4. Launch

We put the system into production, move data if needed, and make sure your people can use it.

5. Operate and support

We run, monitor and support what we build — 24/7 where your operation needs it.

Why short steps beat one big delivery

General guidance from experience: a long plan with one delivery at the end hides problems until it is too late to fix them cheaply. Short steps with a working result each time show early whether the product is right, let you change priorities when you learn something new, and keep the budget under control.

What to prepare for the first conversation

  • The problem in one paragraph: what is slow, expensive or impossible today?
  • Who will use the system: customers, partners, staff — and roughly how many.
  • What exists already: systems, data, a website, documents, designs.
  • What must be true on launch day, and what can wait for later.
  • Your constraints: deadlines, budget range, where data may be stored.
  • Who on your side decides, and who answers detailed questions.

What you receive

  • A written scope and estimate after the requirements phase.
  • Working software after every step, not only at the end.
  • A system in production, with access, logs and security set up.
  • Operation and support from the team that built it.

How we work, in practice

Discover

We map your processes, your systems and your data, and pin down exactly where software or AI removes cost or recovers revenue.

Design

What the system does, who may do what, which data it uses and the rules around it — written down before code is written.

Build and connect

We build, connect the system to the tools you already run, and show you working results regularly.

Harden and verify

Access, consent, retention, separation of data and behaviour under load are verified before anything touches real customers.

Operate and improve

We monitor and improve the system in production, and you see what it does.

Calm launch days

A deliberate path can still move quickly without cutting corners. Every stage is reviewed and secured before the next one starts, so that by launch day the system has already been seen, tried and tested by your people — and going live is an event you plan, not one you fear.

Frequently asked questions

How does a custom project start?

Send us your idea. We reply and propose a short requirements phase, which ends with a written scope and an estimate.

Can we change requirements during the project?

Yes. Building in short steps is meant for that: priorities can change based on what we learn, and we agree the effect on scope and budget.

Do we see the product before it is finished?

Yes. Every step ends with something working that you can see and try.

Who supports the system after launch?

The same team that built it. We operate and support what we build, around the clock where needed.

Do you test under load before launch?

Yes. Security and behaviour under load are verified before the system goes live, and production systems are monitored and patched afterwards.

Ask about Custom development

Send us your idea — we'll propose a short requirements phase.

  • GDPR by design
  • 24/7 operation and support
  • A team of 5 in Sofia, EU

Already running in production at organisations in Bulgaria — names under NDA.

How we prove it →